| Dos |
|
|
- Near the point of supply safety equipments like earth leakage/ overload & short circuit protection (circuit breakers/switches) must be installed.
- At your premises proper earthing must be installed.
|
- When not required switch off the electricity supply.
- Use proper capacity fuse wire for main switches.
- For proper voltage, install adequate capacitors for inductive loads.
|
 |
|
|
|
- To avoid inconvenience due to disconnection, the energy bills must be regularly paid at
GEB's authorized cash collection centers within the due date.
- Always use ISI marked electrical equipments.
- Through licensed electrical contractors cables of ISI mark and proper capacity must be used for installation.
- Provide waterproof enclosures to meters and metering equipments, to ensure their safety.
- Prefer only licensed electrical contractors for rectification of faults.
- GEB authorities must be contacted for difficulties related to electricity supply.
|
|
|
|
|
|
|